HiveBoard Docs Search the docs… Ctrl K Get HiveBoard
Browse the help centre
  1. Help centre
  2. One job, opened

The Overview tab

The Overview tab says how a job is going: why it ended or waits, the time left and how it was worked out, warnings, the key figures and its charts.

5 min read HiveBoard 0.1.7 Updated Your first hour · lesson 9 of 9

In short

  • A sentence at the top says what a finished job's ending means, or why a waiting job has not started.
  • The time left comes with its basis spelled out, and is never longer than the time before the job's wall-time limit.
  • A running job that has written no output for more than 15 minutes gets a warning.
  • The figures and charts are the ones the job's code defines — for a VASP relaxation, energy per ionic step and the current SCF cycle.

The Overview tab is the first thing the job pane shows. It answers two questions: how is this job going, and when will it be done? It holds, from top to bottom, any warnings, a sentence about how the job ended or why it waits, the time left, the key figures and the charts.

While the Overview is showing, HiveBoard reads the job again every 15 seconds and writes the new values in place.

Warnings

A running job whose output files have not changed for more than 15 minutes gets this warning:

No output update for 47 min — job may be stalled.

The gap is never counted as longer than the job has been running, so output left in the folder by an earlier run does not make a fresh job look stalled. A code’s engine can add its own warnings and errors read from the output, and those appear here too.

A stalled job and a slow one look the same from outside. HiveBoard only tells you; it never stops a job by itself.

How it ended, or why it waits

For a finished job, the state is followed by what it means:

  • Completed — “Finished normally — the job ran to the end of its script. That does not by itself mean the calculation converged; check the charts below.”
  • Timed out — “Hit its wall-time limit before finishing. Nothing is wrong with the calculation — it just needed longer. Continue restarts it from the latest geometry.”
  • Out of memory — “Ran out of memory and was killed. Ask for more memory per node, or use more nodes, then resubmit.”
  • Node failure — “A compute node failed underneath the job — this is a server problem, not yours. Resubmitting usually just works.”
  • Cancelled — “Cancelled — either by you, or by the scheduler (often for exceeding a limit).”
  • Failed — “Exited with an error”, with the exit code, and a pointer to the last lines of the log in the Output tab.

A waiting job reads Waiting to start., then the scheduler’s reason in a sentence, then the scheduler’s estimated start, or “No start estimate from the scheduler.”

Slurm reasonWhat the Overview says
PriorityOther jobs are ahead of it in the queue.
ResourcesThe CPUs or nodes it asked for are not free yet.
DependencyIt is waiting for another job to finish first.
ReqNodeNotAvailA node it asked for is down or reserved.

Two more are put in words: PartitionTimeLimit and QOSMaxJobsPerUserLimit. Any other reason is shown as the scheduler gives it. A waiting job shows only what its input says; see Queued jobs and reused folders.

The time left

The large card says how long is left and how that was worked out. For the example job, pt111-co-relax on Ember, after 23 ionic steps:

About 10h 46m left

19% of the way, counted in ionic steps against the most this run may take

How this was estimated: ~400s per ionic step × up to 97 steps left (often converges sooner)

The input allows 120 ionic steps (NSW = 120), so the estimate counts 97 steps still allowed, at the time one step takes. A relaxation usually converges before it uses them all, which is why the sentence says “often converges sooner”. For VASP, the time per step is the average time of the last five ionic steps, as OUTCAR records them; without those, the run time so far divided by the steps done.

The estimate is never longer than the time before the job’s wall-time limit. When the steps left would take longer, the card says “job will hit its wall-time limit first” and adds “it cannot be longer than the time limit”. The scheduler stops a job at its limit whether or not it has finished; see the time-limit bar.

Other cases:

  • A code with no fixed number of steps is counted in time: “wall-clock limit — this calculation has no fixed step count”, and the percentage is of the time limit used.
  • Before there is enough to project from, the card reads No estimate yet and “HiveBoard needs two finished steps to project the rest.”

The figures

Under the card is a row of figures. Which ones depends on the code. For a VASP relaxation they are:

FigureExample
SystemPt(111)-2x2 + CO atop
CalculationStructure relaxation
Ionic steps23 / 120
SCF iteration8 / 60
Last energy-84.2498 eV

System is the SYSTEM line of INCAR. SCF iteration is the electronic step of the current ionic step against NELM. Hover over a figure to see where it comes from.

The charts

The charts are the ones the job’s code defines; The twenty supported codes lists them per code. A VASP relaxation has two:

  • Energy per ionic step — the energy (E0, in eV) after each ionic step.
  • SCF convergence (current cycle) — how much the energy changes per electronic iteration in the current ionic step, as log₁₀|ΔE|, with a dashed line marked target at your EDIFF.

A VASP NEB shows Energy profile along NEB path, the energy of each image against the first. Hover over a chart for the exact value at a point, such as ionic step 23: -84.2498 — E0 (eV).

A chart is drawn from its second point. Before that the tab says “Only one point so far” or “No chart yet”, with a button to open the output.

A folder HiveBoard does not recognise

If no engine recognises the job’s folder, the Overview says so, shows the time used against the limit, and names the codes it looked for on that server, with Change in Connections. The output and files are still there. See A job shows no code, or “other”.

Check yourself

2 quick questions on this page. Nothing is sent anywhere.

  1. The Overview says: How this was estimated: ~400s per ionic step × up to 97 steps left (often converges sooner). What does 97 count?

    • The steps left before the most the run may take (NSW)
    • The steps the relaxation still needs to converge
    • The minutes left before the wall-time limit
    • The SCF iterations left in this ionic step
    Show the answer

    The steps left before the most the run may take (NSW) The estimate counts against the most steps the input allows; a relaxation often converges sooner, which the sentence says.

  2. When does a running job get the warning that it may be stalled?

    • When its output has not changed for more than 15 minutes
    • When it has used 80 % of its wall time
    • When its energy goes up between two steps
    • Never; HiveBoard only reports finished jobs
    Show the answer

    When its output has not changed for more than 15 minutes The warning appears when the output files have not changed for more than 15 minutes of the job's own run time.

Try it in the app

On your own computer, with HiveBoard open. Tick them off as you go.

Lesson 9 of 9 in Your first hour Back to the path

Written for HiveBoard 0.1.7, the version on the download page. Examples use a made-up cluster (Ember) and person (zoe). Something here not what you see? Report it from the app.

↑ ↓ to moveEnter to openEsc to close