# The Overview tab

> The Overview tab says how a job is going: why it ended or waits, the time left and how it was worked out, warnings, the key figures and its charts.

Source: https://hiveboard.dev/docs/job/overview-tab · Section: One job, opened · HiveBoard 0.1.7 · Updated 2026-10-19

## In short

- A sentence at the top says what a finished job's ending means, or why a waiting job has not started.
- The time left comes with its basis spelled out, and is never longer than the time before the job's wall-time limit.
- A running job that has written no output for more than 15 minutes gets a warning.
- The figures and charts are the ones the job's code defines — for a VASP relaxation, energy per ionic step and the current SCF cycle.

The Overview tab is the first thing the [job pane](/docs/job/job-pane) shows. It answers two
questions: how is this job going, and when will it be done? It holds, from top to bottom, any
warnings, a sentence about how the job ended or why it waits, the time left, the key figures
and the charts.

While the Overview is showing, HiveBoard reads the job again every 15 seconds and writes the new
values in place.

## Warnings

A running job whose output files have not changed for more than 15 minutes gets this warning:

> No output update for 47 min — job may be stalled.

The gap is never counted as longer than the job has been running, so output left in the folder
by an earlier run does not make a fresh job look stalled. A code's engine can add its own
warnings and errors read from the output, and those appear here too.

A stalled job and a slow one look the same from outside. HiveBoard only tells you; it never
stops a job by itself.

## How it ended, or why it waits

For a finished job, the state is followed by what it means:

- **Completed** — "Finished normally — the job ran to the end of its script. That does not by
  itself mean the calculation converged; check the charts below."
- **Timed out** — "Hit its wall-time limit before finishing. Nothing is wrong with the
  calculation — it just needed longer. Continue restarts it from the latest geometry."
- **Out of memory** — "Ran out of memory and was killed. Ask for more memory per node, or use
  more nodes, then resubmit."
- **Node failure** — "A compute node failed underneath the job — this is a server problem, not
  yours. Resubmitting usually just works."
- **Cancelled** — "Cancelled — either by you, or by the scheduler (often for exceeding a limit)."
- **Failed** — "Exited with an error", with the exit code, and a pointer to the last lines of
  the log in the [Output tab](/docs/job/output-tab).

A waiting job reads **Waiting to start.**, then the scheduler's reason in a sentence, then the
scheduler's estimated start, or "No start estimate from the scheduler."

| Slurm reason | What the Overview says |
|---|---|
| `Priority` | Other jobs are ahead of it in the queue. |
| `Resources` | The CPUs or nodes it asked for are not free yet. |
| `Dependency` | It is waiting for another job to finish first. |
| `ReqNodeNotAvail` | A node it asked for is down or reserved. |

Two more are put in words: `PartitionTimeLimit` and `QOSMaxJobsPerUserLimit`. Any other reason
is shown as the scheduler gives it. A waiting job shows only what its input says; see
[Queued jobs and reused folders](/docs/job/queued-and-reused-folders).

## The time left

The large card says how long is left and how that was worked out. For the example job,
`pt111-co-relax` on Ember, after 23 ionic steps:

> **About 10h 46m left**
>
> 19% of the way, counted in ionic steps against the most this run may take
>
> How this was estimated: ~400s per ionic step × up to 97 steps left (often converges sooner)

The input allows 120 ionic steps (`NSW = 120`), so the estimate counts 97 steps still allowed,
at the time one step takes. A relaxation usually converges before it uses them all, which is
why the sentence says "often converges sooner". For VASP, the time per step is the average time
of the last five ionic steps, as `OUTCAR` records them; without those, the run time so far
divided by the steps done.

The estimate is never longer than the time before the job's wall-time limit. When the steps
left would take longer, the card says "job will hit its wall-time limit first" and adds "it
cannot be longer than the time limit". The scheduler stops a job at its limit whether or not it
has finished; see [the time-limit bar](/docs/jobs/time-limit-bar).

Other cases:

- A code with no fixed number of steps is counted in time: "wall-clock limit — this calculation
  has no fixed step count", and the percentage is of the time limit used.
- Before there is enough to project from, the card reads **No estimate yet** and "HiveBoard
  needs two finished steps to project the rest."

## The figures

Under the card is a row of figures. Which ones depends on the code. For a VASP relaxation they
are:

| Figure | Example |
|---|---|
| System | Pt(111)-2x2 + CO atop |
| Calculation | Structure relaxation |
| Ionic steps | 23 / 120 |
| SCF iteration | 8 / 60 |
| Last energy | -84.2498 eV |

**System** is the `SYSTEM` line of `INCAR`. **SCF iteration** is the electronic step of the
current ionic step against `NELM`. Hover over a figure to see where it comes from.

## The charts

The charts are the ones the job's code defines;
[The twenty supported codes](/docs/codes/supported-codes) lists them per code. A VASP relaxation has two:

- **Energy per ionic step** — the energy (`E0`, in eV) after each ionic step.
- **SCF convergence (current cycle)** — how much the energy changes per electronic iteration in
  the current ionic step, as log₁₀|ΔE|, with a dashed line marked *target* at your `EDIFF`.

A VASP NEB shows **Energy profile along NEB path**, the energy of each image against the first.
Hover over a chart for the exact value at a point, such as `ionic step 23: -84.2498 — E0 (eV)`.

A chart is drawn from its second point. Before that the tab says "Only one point so far" or "No
chart yet", with a button to open the output.

## A folder HiveBoard does not recognise

If no engine recognises the job's folder, the Overview says so, shows the time used against the
limit, and names the codes it looked for on that server, with **Change in Connections**. The
output and files are still there. See
[A job shows no code, or "other"](/docs/help/code-not-recognised).

## Check yourself

1. The Overview says: How this was estimated: ~400s per ionic step × up to 97 steps left (often converges sooner). What does 97 count?
   - The steps left before the most the run may take (NSW) ← the answer
   - The steps the relaxation still needs to converge
   - The minutes left before the wall-time limit
   - The SCF iterations left in this ionic step
   Why: The estimate counts against the most steps the input allows; a relaxation often converges sooner, which the sentence says.

2. When does a running job get the warning that it may be stalled?
   - When its output has not changed for more than 15 minutes ← the answer
   - When it has used 80 % of its wall time
   - When its energy goes up between two steps
   - Never; HiveBoard only reports finished jobs
   Why: The warning appears when the output files have not changed for more than 15 minutes of the job's own run time.

## Try it in the app

- Open one of your running jobs and read the line that starts How this was estimated.
- Hover over a point on one of its charts and read the exact value.
- Open a finished job and read the sentence that says what its ending means.

## Related

- [The job pane](https://hiveboard.dev/docs/job/job-pane.md)
- [The time-limit bar](https://hiveboard.dev/docs/jobs/time-limit-bar.md)
- [VASP jobs](https://hiveboard.dev/docs/codes/vasp.md)
- [The twenty supported codes](https://hiveboard.dev/docs/codes/supported-codes.md)
- [A job shows no code, or "other"](https://hiveboard.dev/docs/help/code-not-recognised.md)
