# The time-limit bar

> The Runtime column's bar shows how much of its wall-time limit a job has used; it turns amber at 80 % and red at 95 %, before the scheduler stops it.

Source: https://hiveboard.dev/docs/jobs/time-limit-bar · Section: The job list · HiveBoard 0.1.7 · Updated 2026-10-19

## In short

- The Runtime column shows a bar and a line such as 2h 33m of 1d 0h limit: how much of its wall-time limit the job has used.
- For a running job the bar turns amber at 80 % of the limit and red at 95 %, and the line adds the percentage.
- The scheduler stops a job at its limit whether or not it has finished, so a red bar is a warning to act or to expect a Timed out ending.
- HiveBoard never changes a job's limit.

Every job is submitted with a *wall-time limit* — the longest it may run, in real time, set with `--time` or `#SBATCH -t`. The **Runtime** column shows how much of it a job has used: a bar, and under it a line such as "2h 33m of 1d 0h limit". For a running job the bar turns **amber at 80 %** of the limit and **red at 95 %**, because the scheduler stops the job at the limit whether or not it has finished.

## Reading the bar

The job `pt111-co-relax` on Ember asked for one day. Its line reads, as it runs:

| Used | The bar | The line under it |
|---|---|---|
| under 80 % | the usual colour | 2h 33m of 1d 0h limit |
| 80 % or more | amber | 20h 10m of 1d 0h limit · 84% of wall-time |
| 95 % or more | red | 23h 0m of 1d 0h limit · 96% of wall-time |

Hover the line of an amber or red bar and HiveBoard spells it out: "Approaching its 1d 0h wall-time limit (96%). The scheduler will stop it at the limit even if it hasn't finished."

Times are written short: `45s`, `12m`, `2h 33m`, and days with hours, `1d 0h`.

## Which jobs warn

Only running jobs turn amber or red.

- A waiting job has used nothing yet, so its bar is empty.
- A finished job's bar shows how much of its limit it used, without the warning colours. A job that ran out of time shows **Timed out** in the **State** column.
- When the scheduler reports no limit for a job, its bar stays empty and the limit reads "—".

## Why it matters

When a job reaches its limit, Slurm ends it. Whatever the program had not written out is lost, and the job ends as **Timed out**. An amber bar is the moment to decide: let it run and expect that ending, or plan the next run.

HiveBoard never changes a job's limit. What you can do with it:

- **Open the job** to see how far it has got. The time-left estimate on its Overview tab is never longer than the time the limit leaves; when the limit will come first, its basis says "job will hit its wall-time limit first". See [The Overview tab](/docs/job/overview-tab).
- **Continue a VASP run** that stopped at its limit before converging, from where it stopped — with job control on. See [Continuing a VASP run](/docs/job-control/continue-a-run).
- **Let Guardian do it**: in its second mode, and with job control on, it continues your VASP relaxations that ended at the limit without converging. See [Guardian](/docs/guardian/guardian).

## Finding the jobs at risk

- Sort the list by **Runtime**, or filter it — runtime filters are typed in minutes (see [Filtering and sorting](/docs/jobs/filter-and-sort)).
- In Statistics, **Closest to the wall-time limit** (on the **Overview** and **Live queue** tabs) lists the running jobs that have used the largest share of their limit, in the same amber and red.
- **Wall-time efficiency** on the **History** tab shows how much of the requested time your finished jobs used, and how many hit the limit. See [Statistics](/docs/statistics/statistics-page).

## Check yourself

1. A running job's bar has turned red. What does that mean?
   - It has used 95 % or more of its wall-time limit ← the answer
   - It has failed
   - Its output has stopped growing
   Why: The bar turns amber at 80 % and red at 95 % of the wall-time limit; it says nothing about errors or output.

2. What happens when a job reaches its wall-time limit?
   - The scheduler stops it, finished or not ← the answer
   - HiveBoard extends the limit for it
   - Nothing; the bar simply stays red
   Why: The limit is the scheduler's: it ends the job at the limit, and the job then shows as Timed out. HiveBoard never changes a limit.

## Try it in the app

- Sort the job list by **Runtime** and look at the bars of your longest-running jobs.
- Hover the text under an amber or red bar and read what HiveBoard says about the limit.
- Open Statistics and find the panel **Closest to the wall-time limit**.

## Related

- [The Jobs page](https://hiveboard.dev/docs/jobs/jobs-page.md)
- [The Overview tab](https://hiveboard.dev/docs/job/overview-tab.md)
- [Continuing a VASP run](https://hiveboard.dev/docs/job-control/continue-a-run.md)
- [The Statistics page](https://hiveboard.dev/docs/statistics/statistics-page.md)
- [Guardian](https://hiveboard.dev/docs/guardian/guardian.md)
